Tech Tip: Installation of the TS4-R-F Line of SMA-Compatible SunSpec Certified Rapid Shutdown Receivers

Trish Morattoby Trish Moratto (guest post), , 0 Comments
Solar Academy trainer Mike Mahon

In our latest Tech Tip video, SMA Solar Academy Senior Technical Trainer Mike Mahon demonstrates how to install the TS4-R-F line of SMA-compatible SunSpec certified rapid shutdown receivers.

Installation of SunSpec Certified Shutdown Receiver

These devices, when paired with the SMA US-41 line of Sunny Boy or CORE1 inverters, provide easy-to-install, reliable, module-level shutdown to meet all the 2017 and 2020 NEC requirements.

The Tech Tip video covers the installation of SMA’s TS4-R-F unit—the first SunSpec certified shutdown receiver tested to ensure full compatibility with the Sunny Boy US-41 and CORE1 US-41 lines.

To learn more about all the benefits of the TS4-R-F line, watch this video or visit the webpage.

0 Comments
Leave a Reply
Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>