Solar Tracker Farm in North America Operates with Unique, Decentralized Design
At the time of commissioning, the South Burlington Solar Farm located in South Burlington, Vermont, was the largest decentralized solar tracker farm located in North America. AllEarth Renewables, the tracker manufacturer and EPC contractor, wanted to design a solar farm that maximized reliability and production. This unique 2.13 MW solar farm operates using a decentralized design, and utilizes state-of-the-art wireless communications technology to provide power to Vermont’s feed-in-tariff program.
About The Farm
The 25-acre solar farm is comprised of more than 9,000 panels, 382 SMA Sunny Boy 6000-US string inverters and AllEarth Renewables AllSun Series 24 dual-axis trackers. Each array is composed of 12 modules per circuit on a dual-axis tracked ground mount. Each top pole mounted sub-array has its own dedicated MPPT input to help optimize performance, tracking the movement of the sun. This system can produce up to 45 percent more electricity than a fixed, roof mounted PV system of the same size.
“The decentralized design and innovative wireless technology of this solar farm result in a more efficient, reliable performance with minimal power loss. Our goal is to produce more energy with this type of system than other utility-scale solar plants so we can achieve maximum power output.” – David Blittersdorf, President and CEO of AllEarth Renewables
Advanced Wireless Communications
Communications equipment from the site is housed in one central location and includes a high-speed modem and central radio. The AllEarth Renewable advanced communications system allows for power, energy and voltage, and wind speed reporting from each AllSun Tracker. This wireless technology even allowed for the Vermont governor to commission the project using an iPhone.
Solar Spotlight aims to highlight SMA inverters in real-world situations. Email us with information about your SMA-powered PV projects at SocialMedia@SMA-America.com
Dear Sir,
I write to inquire if your company is capable and willing to supply your product / equipment to the North East Development Commission (NEDC) in their on going tender. The commission was established in October 2017 by Federal Government of Nigeria to help and develop the Six States of the North East Region of the country that has been affected by insurgency.
The terms as indicated by the MD , whom i am close to are :
Contract Duration: 12 months
Payment Terms: 100% Advance via TT
Delivery Port: Apapa Seaport Lagos Nigeria
Please write back and indicate your interest and i will send you the necessary details.
Waiting for your response,
Best regards
Kingsley Opia
I have been to this…..went to end of cul de sac, walked down road to fence. This is an awesome project. VT is really dynamic in moving the sustainability and decentralized needle…Hope VT can continue to lead…..